CONSTRUCTION WORKS AND INSTALLATION OF EQUIPMENT FOR “RAPUN HEC”
Location: Rapun, Elbasan / Albania
Duration: 2015 – 2016
Client: HEC Rapun
Scope: Installation of Francis Turbine, horizontal spirals, and operations office
Type of Contract: Construction and Assembly (Subcontractor)
Construction activities at the Rapun HEC included the installation of Francis turbine and horizontal coils for HEC. A small operational office made of steel was also built.